PROJECTS
Featured Projects & Publications
08 PROJECTS
National Demand Forecasting Model
National Transport Authority (NTA), Ireland
RoleManaged the development and calibration of the NDFM; developed the National Trip End Model
The NTA's Regional Modelling System is the strategic tool behind national transport planning in Ireland: a National Demand Forecasting Model that feeds five regional multi-modal models, which together cover the entire Republic of Ireland.
NTA Long Distance Model
National Transport Authority (NTA) · SYSTRA · 2019
RoleDeveloped the Long Distance Demand Model; co-presenter at ETC 2019
The NTA's model of long-distance inter-urban travel across Ireland and Northern Ireland by car, bus, rail and goods vehicle. Recent work improved long-distance rail demand forecasting, so the model can test more trains, higher capacity or fare changes.
M74 Completion Scheme — 5 Years After
Transport Scotland · SYSTRA · 2016–2017
RoleCo-author of the five-year post-opening evaluation
Five-year after-opening evaluation of the M74 Completion — about 8 km of motorway across the south side of Glasgow, opened in June 2011 — for Transport Scotland. Observed traffic was compared with what the scheme was expected to deliver.
Road Safety via Traffic Conflicts
With the Transport Research Centre (CDV) · 2014
RoleCo-author
A pilot comparing traffic conflicts produced by S-Paramics microsimulation with conflicts observed on street using the Czech traffic conflict technique — testing microsimulation as a proactive road-safety tool that does not have to wait for years of accident records.
Commonwealth Games Visitor Demand
Glasgow 2014 · Birmingham 2022 · 2014 · 2022
RoleInvolved in modelling visitor demand
Visitor demand modelling and planning for two Commonwealth Games — forecasting how visitors travel to venues on event days.
Lane Cove Tunnel Microsimulation
Hyder Consulting · 2006–2007
RoleInvolved in developing the microsimulation model
Microsimulation model of the surface road network along the full length of the Lane Cove Tunnel corridor in Sydney, used to assess traffic management plans while the 3.6 km twin-tube tunnel was being built. At the time it was the largest microsimulation model in Australia by geographical coverage.
Dandenong Revitalisation Microsimulation
Hyder Consulting · 2006–2007
RoleResponsible for the model and option testing
Microsimulation model of Dandenong in Melbourne, used to test revitalisation options — land-use changes, road network alterations and public transport operations — for one of the largest revitalisation projects in Australia at the time.
UK Town Microsimulation Models
UK portfolio
RoleDeveloped the microsimulation models
Eleven microsimulation models for towns across England and the Isle of Man, alongside variable demand models of Plymouth and Chippenham.
PUBLICATIONS & CONFERENCE PAPERS
Papers & Presentations
- NTA, SEPTEMBER 2025 · PRESENTED AT ETC 2025, ANTWERPPost COVID-19 Trip Rate Estimation in IrelandWilliam Brazil, Warren Whitney, Jiri Paukrt
- EUROPEAN TRANSPORT CONFERENCE (ETC 2019), DUBLINNational Transport Authority Long Distance ModelSean Kearns, Jiri Paukrt
- STAR CONFERENCE 2017, GLASGOWScottish Trunk Road Infrastructure Project Evaluation (STRIPE): M74 Completion Scheme — 5 Years After OpeningRobert Allan, Iain Clement, Jiri Paukrt
- ICTTE 2014, BELGRADERoad safety evaluation using traffic conflicts: Pilot comparison of micro-simulation and observationJiří Ambros, Richard Turek, Jiri Paukrt