M74 Completion Scheme — 5 Years After

Transport Scotland · SYSTRA · Glasgow, Scotland · 2016–2017

Jiri's roleCo-author of the five-year post-opening evaluation

Five-year after-opening evaluation of the M74 Completion — about 8 km of motorway across the south side of Glasgow, opened in June 2011 — for Transport Scotland. Observed traffic was compared with what the scheme was expected to deliver.

Used forChecking whether the new motorway delivered the expected traffic relief five years after it opened.

~8 km
New motorway
5 yrs
After opening
Show on map

How this kind of work is done

The method, in pictures

LESS TRAFFICMORE TRAFFICBEFORE vs AFTER
Evaluation: how traffic moved after a scheme opened
ASSIGNED FLOWS · BANDWIDTH
Assignment: traffic loaded onto the road network
OBSERVED COUNTSMODELLED FLOWSGEH < 5
Calibration: modelled flows checked against observed counts

Illustrations of the method — not data from this project.